More than 1.300 pcs. of carbon steel square finned tubes are ready for dispatch. These types of pipes are used for heat exchangers in waste incineration plants and biomass plants.
For this project the production machine was adjusted to customized dimensions (75 x 89mm for tube 48,3 OD and 75 x 75mm for tube 33,7mm OD).